three. Following rig positioning, push the casing into the bottom. Travel metal casing to a least a depth of 1 m down below the ground amount to consider lateral masses and actions at site. The steel casing also fight problems as a result of groundwater for the duration of piling.Piles have been casted greater than the final level to manage laitanc